Main contractor: Omran Sarir International Co.

Subcontractor: Mormont construction inc. (Payab Omran Sepahan Co.)

Construction of Metro Station, “33 Pol Bridge” (Esfahan, Iran)

Apr 2016 up to Oct 2016

Head of the technical office of the project

  • 150,000 m² with Concrete structures, 4 floors (3 floor underground) Including:
  • Excavation and excavation: 180,000 m3
  • Steel: 17,800 ton
  • Concrete: 23,600 m3
  • Brick walls and prefabricated plaster 45,700 m²
  • Wall covering: slab stone, plaster and tile: 55,500 m²
  • Floor coverings: Ceramic, slab stone: 37,900 m²
  • Landscaping and green space: 200,000 m²
  • Mechanical and electrical equipment
images

800 residential units