Construction

Main contractor: Tamam Bana Sepahan Co.

Subcontractor: Mormont construction inc.

Oct 2016 up to Jan 2020

Technical Director of Central Office

Construction of 800 residential apartment units (Esfahan, Iran)

  • 35,500 m² with Concrete structures, 42 Building,4 to 10 floors (1 floor underground) Including:
  • Excavation and excavation: 70,500 m3
  • Steel: 4,300 ton
  • Concrete: 20,100 m3
  • Brick walls and prefabricated plaster: 17,300 m²
  • Wallcovering: slab stone, plaster, and tile: 17,200 m²
  • Floor coverings: Ceramic, slab stone: 26,900 m²
  • Landscaping and green space: 150,000 m²
  • Mechanical and electrical equipment